October 1, 2008

Work update.


The new wing with the stucko finish and the paint.

60 ton crane going in for a pick. Today the tinners/HVAC guys were flying the new air handlers up to the roof 6 stories up. The crane was brought in from Pheonix.

The first pick of the day. The green tarps in the foreground are the air handlers. They weigh 13,000 lbs each.

Almost there easy does it. Easy does it...


Back on the ground and on the first floor. This is what I have been doing. Installing the medical gas outlets in the walls and connecting them to the mains using type K copper. All we have left to do are the boom outlets and the first floor will be done!! Booms are used to hang the lights and other equipment from.

No comments: