Where I hope to be working for the next 2 years.


The new 6 story wing for UMC Hospital


The UMC new Emergency Room and ICU wing.


Joel my helper soldering a 6 inch water main to serve the new wing.

The air intake shaft for the hospital and the new medical gas piping that Sun Mechanical installed, while I was working at Miraval.

The scaffold that we used to work from to install the 6 inch water main up the wall and out into another area of the hospital. This fresh air intake is at least 6 stories high and the scaffold rises only 40 feet!! We used the ladder to get to the different levels.